Westwood Park refurbishment project

Westwood Park, Yorkshire – Refurbishment Project

Project: Westwood Park 

Client: P J Livesey Group 

Project Location: Beverley, Yorkshire 

Project Type: Refurbishment – Change of use 

Project Size: 60 Dwellings 

Product Used: IsoDek 30 (ID30) 

This project saw the conversion of the former Westwood Hospital into 60 luxury dwellings. 

 An acoustic solution was required for the conversion of the Grade II listed Main and Archway Buildings into 20 apartments and houses.  

 The solution had to meet the high levels of performance that were required for luxury dwellings, but this had to be done without making any meaningful changes to the existing floor levels.  

 After exploring various options, it was agreed that using an acoustic structural deck was the best solution and ID30 was specified. This minimised the increase to floor depths and provided the excellent acoustic performance required. 

Download Westwood Park Case Study